Caple C891C Spécifications

Naviguer en ligne ou télécharger Spécifications pour Plaques chauffantes Caple C891C. Caple C891C Specifications Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 12
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
02/12 EINS 515736
For use in GB and IE
LEAVE WITH CUSTOMER
AGA 13 AMP RETRO-FIT WITH AIMS
(OIL TO ELECTRIC)
FITTING INSTRUCTIONS
Vue de la page 0
1 2 3 4 5 6 ... 11 12

Résumé du contenu

Page 1 - FITTING INSTRUCTIONS

02/12 EINS 515736For use in GB and IELEAVE WITH CUSTOMERAGA 13 AMP RETRO-FIT WITH AIMS(OIL TO ELECTRIC)FITTING INSTRUCTIONS

Page 2 - BOILER MODELS (OCB AND OEB)

INSTALLATION SHEET 4FIG. 1 REMOVE CABLE CLAMP. ATTACH MAINS CABLEFIG. 2 FIX CABLE CLAMP TO CONTROLS PANELFIG. 3 ROUTE THERMOCOUPLE THROUGH NOTCH

Page 3 - REMOVE INSULATION

INSTALLATION SHEET 5FIG. 1 POST 2000 STAT PHIAL PRE 2000 STAT PHIALSUPPORT BRACKET SUPPORT BRACKETFIG. 2A POSITION THEROCOUPLE (10mm SPA

Page 4 - FIT STAINLESS STEEL TUNNEL

12For further advice or information please contactyour local distributor/stockistWith AGA-Rangemaster’s policy of continuousproduct improvement, the C

Page 5 - CHECK LEVELS AND RE-BUILD

2l ISOLATE ELECTRIC SUPPLY, OIL SUPPLY AND WATER SUPPLY (BOILER MODELS), BEFORE COMMENCING WORK.BOILER MODELS (OCB AND OEB)IMPORTANT NOTE: The boiler

Page 6 - ELECTRICAL

3DE-COMMISSION OIL SUPPLY AND REMOVE OIL CONTROLS1. Turn off oil supply, disconnect supply to appliance (preferably outdoors) and cap off. Turn on sup

Page 7 - INSTALLATION SHEET 1

4FIT STAINLESS STEEL TUNNEL1. Fit new stainless steel tunnel (between barrel and roasting oven).2. Replace barrel (use new graphite barrel gasket and

Page 8 - INSTALLATION SHEET 2

511. Fix mains cable through cable clamp. Fix cable clamp to control panel (See Installation Sheet 4, Figs. 1 and 2).12. Attach mains wiring to contro

Page 9 - INSTALLATION SHEET 3

6ELECTRICALWARNING: THIS APPLIANCE MUST BE EARTHED.THIS APPLIANCE IS DESIGNED FOR THE VOLTAGE STATED ON THE RATING PLATE, WHICH IS SITUATED ONTHE TOP

Page 10 - INSTALLATION SHEET 4

INSTALLATION SHEET 1FIG. 1 OIL CONTROLS TO BE REMOVED FIG. 2 CAP OFF OIL SUPPLYFIG. 3 FIT NEW ROPE SEAL FIG. 4 FIT TUNNEL BETWEEN BARREL &

Page 11 - INSTALLATION SHEET 5

INSTALLATION SHEET 2FIG. 1 DRILL AND TAP HOLE (M6) FIG. 2 OPEN OUT HOLE INTO OVENFIG. 3 MODIFY HOLE FOR FLEX CONDUIT FITTING FIG. 4 FIT LOCATIO

Page 12

INSTALLATION SHEET 3FIG. 1 FIG. 2 FIT INSULATION BLANKETFIG. 3 FIXINGS FOR CONTROL BACK COVER FIG. 4 FIG. 5 M5 STUD FITTED TO BURNER D

Commentaires sur ces manuels

Pas de commentaire