Caple C602E Manuel d'installation Page 21

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 40
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 20
Revision 1.9 - 21 -
Control power wiring setup
To maintain the best possible power supply, install the auxiliary batteries as close as possible to the gate.
- Truck installations might not have an auxiliary battery kit (PALFINGER Liftgates always recommends
a kit). In this
case you have to run the control power straight off the truck battery.
- Trailer installations always have a battery kit (at least 2 batteries) attached to frame on driver side
Connect your control power to the positive (#2 & #4) and the negative (#1 & gr/ye) post of the batteries.
Control Power 4-Wire Cable
Truck Application-Always wire to truck battery
Trailer Application-wire to aux. battery
+
-
20 Amp
In-Line
Fuse
+
-
Wires marked
#2;#4 (Black)
go to hot,
#1 and green/yellow
go to ground
PC-board
2
27
15 Amp fuses
J1 Plug
#2
#4
+
+
E
E
-
-
gr/ye
#1
J2 Plug
Optional:
Main power
on/off switch
Figure 13 Board control power wiring connection
Ground Cable
Ground
at frame
(Third Battery Shown
for heavy applications Only)
+-
Liftgate Mount Frame
Main Truck
Batteries
2 Ga. Liftgate Power Cable
Ground
+-
+
-
To Ignition
Switch
Ground
Aux. Batteries
Battery
Isolator
+
-
(if applicable)
Circuit
Breaker
+-
Circuit
Breaker
Figure 14 Main Power supply setup
Vue de la page 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 39 40

Commentaires sur ces manuels

Pas de commentaire