Caple C602E Manuel d'installation Page 27

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 40
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 26
Revision 1.9 - 27 -
6.4
Trail charger installation
Ground Cable
Ground
+-
Liftgate Mount Frame
2 Ga. Liftgate Power Cable
Ground
+-
Aux. Batteries
+-
Ground
+
-
+
Figure 23 Trail charger wiring
Install the 2 Ga. positive and negative battery cables securely from mount frame to battery and
truck/trailer chassis with proper service loop for sliding liftgate. Make sure the cables cannot catch on
anything during the slide, test several times.
Running the cables along the frame, secure the cables every 12 inches.
Trail Charger
7 way plug
– aux pin
for tractor ignition
switch
7 way plug
– white
for tractor power
Vue de la page 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 39 40

Commentaires sur ces manuels

Pas de commentaire