Revision 1.9 - 23 -
5.4.2
Slider rail stops setting
7
0
0
Figure 17 Slider rail stops
• For final adjustment, lift the platform all the way up till it is level with the truck/trailer floor
• Choose the hole that is the closest to the mount plate in the slider rail
• Install the bolt and tie it down in each side.
• Use the same hole on each side to assure an even position of the platform with the body.
5.4.3
Control box installation
Determine location for control box; locate it in a way that the operator can view the platform and surrounding
areas while operating the liftgate.
4 Hot/Power
6 down
5 up
Hot-#4.3- yellow / green
Up-#5.2- wire 1
Down-#6.2- wire 2
Slide In-#3.2- 80 - wire 4
Slide Out-# 81- wire 3
Flush Mount 3 Button Control
3 4
3 4
3 4
1 2
3 4
3 4
Hot-#4.3- yellow / green
Slide In-#3.2- 80 - wire 4
Up-#5.2- wire 1
Down-#6.2- wire 2
Slide Out-# 81- wire 3
no
no
no
nc
no
no
( Toggle-#4 )
( Toggle-#5 )
( Toggle-#6 )
Toggle Switch (Optional)
Optional
Figure 18 Flush mount Control box wiring
• Run the 5-wire harness, coming out of the main wire loom, to the control box. Run the wire inside the
body and connect wires as shown in Figure 18.
• Make sure all jumpers inside the control are set and cables are tight at the contact blocks.
Holes for
slider stop
adjustment